Projects Portfolio

Past Projects

Solomon Sediment Ponds
PROJECTDownload Fact Sheet (PDF)

Solomon Kings OPF Sediment Ponds

CLIENT

Fortescue Metals

LOCATION

Pilbara, Western Australia

Eastern Guruma to repair the existing sediment ponds at Solomon Mine

 

 

Project: Western Turner Syncline - Mining

 

Download Fact Sheet (PDF)PROJECT

Western Turner Syncline

CLIENT

Rio Tinto Iron Ore

LOCATION

Pilbara, Western Australia

VALUE

AU$236 Million

Eastern Guruma established a 50/50 Joint Venture with NRW to undertake initial mining works at Western Turner Syncline.
 

 

 

Project: Western Turner Brockman - Civil

 

Download Fact Sheet (PDF)PROJECT

Western Turner Brockman

CLIENT

Rio Tinto Iron Ore

LOCATION

Pilbara, Western Australia

VALUE

AU$305 Million

The Western Turner Brockman project comprised of simultaneous works in two separate locations, approximately 45 kilometers apart and was carried out by the Eastern Guruma and NRW joint venture.
 

 

 


Project: Solomon Mine

Download Fact Sheet (PDF)PROJECT

Solomon Pre-Mining Development Works

CLIENT

Fortescue Metals

LOCATION

Pilbara, Western Australia

VALUE

AU$93 Million

A Joint Venture with NRW, Eastern Guruma and Ngarluma and Yindjibarndi Foundation Limited (NYFL) was initially awarded Solomon Phase 1 for works to supply labour and equipment to complete bulk earthworks, drill & blast and culvert installation at Fortescue's Solomon Mine.

 

 

Project: Boolgeeda Airstrip Upgrade

 

Download Fact Sheet (PDF)PROJECT

Boolgeeda Airstrip Upgrade

CLIENT

Rio Tinto Iron Ore

LOCATION

Pilbara, Western Australia

VALUE

AU$25 Million

The scope of work required on this Project was the upgrade and expansion of the gravel runway at Rio Tinto's Boolgeeda Aerodrome.

 


Project: Solomon Tailings Storage Facility

Download Fact Sheet (PDF)PROJECT

Solomon Tailings Storage

CLIENT

Fortescue Metals Group

LOCATION

Pilbara, Western Australia

VALUE

AU$16 Million

Eastern Guruma in a Joint Venture with Viento and Wirlu-Murra Yindjibarndi was awarded the contract for construction of the Tailings Storage Facility at Solomon Mine.

 


Project: Western Turner Syncline Concrete

Download Fact Sheet (PDF)PROJECT

Western Turner Syncline Concrete

CLIENT

Rio Tinto Iron Ore

LOCATION

Pilbara, Western Australia

VALUE

AU$94 Million

Eastern Guruma in joint venture with NRW undertook the concrete and civil works at Western Turner Syncline Mine.

 

 

Project: Nammuldi Below Water Table Earthworks

PROJECTDownload Fact Sheet (PDF)

Nammuldi Below Water Table Bulk Earthworks

CLIENT

Rio Tinto Iron ore

LOCATION

Pilbara, Western Australia

VALUE

AU$170 Million

The NRW/ Eastern Guruma Joint Venture undertook bulk earthworks at Nammuldi Below Water Table (NBWT) Mine.